Irvine, CA – The move-in process is going well. It sure is nice being the largest tenant in the building. We get the signage.
The movers are moving the furniture it late into the night. They are busting their butts. The same for the Alvaka engineers. They have all the technology moved over and the cut-over was successful. Last night was Roger’s birthday and Teresa took time out for us all to surprise him with a cake.
The LANCAB guys have most of the cabling work done and they are mounting our display wall with the LCD displays. Getting them all level and perfectly lined-up is a task.
The installation of the routers and switches in the new communication room is almost complete.